Type:
Temporary Works
Date: September 2016 to November 2020
Client: Lend Lease Engineering
Project: Kingsford Smith Drive Upgrades
Scope:
The principal contractor Lend Lease engaged FSACE to provide structural design calculation checks and drawings for a number of temporary works items including:
We note that FSACE have completed the majority of the structural steel temporary work designs for this project.
The recent condition report completed by FSACE was excellent and we appreciate their prompt action on this project.