Warrell Creek Bridge

Featured Project: Warrell Creek Bridge

Type: Temporary Works
Date: December 2015 to May 2017
Client: Brady Marine and Civil
Project: Warrell Creek Bridge
Scope:

The principal contractor Brady Marine and Civil engaged FSACE to provide structural design calculation checks and drawings for a number of temporary works items including:

  • Temporary girder bracing design for the lateral restrain and the transfloor bracing of girders;
  • Design a temporary access platform for the installation of a drainage pipe to the outer edge soffit of up to eight bridges; and
  • Reo cage lifting design.