Kangaroo Point Green Bridge

Featured Project: Kangaroo Point Green Bridge

Type: Temporary Works
Date: September 2021 to August 2024
Client: BESIX Watpac
Project: Kangaroo Point Green Bridge
Scope:

FSACE were intrinsically involved in a variety of marine and temporary works designs for the Kangaroo Point Green Bridge Project, located within the heart of Brisbane City, Queensland. The project involved the design and construction of a 460m long single-mast cable stay bridge, providing a link for pedestrians and cyclists between Brisbane CBD and Kangaroo Point peninsula. Our involvement in this project is detailed as follows:

  • Design of a variety of aspects relating to the marine based Favco crane, particularly and proudly the substructure and piles supporting the crane which has a lifting capacity of 220 tonnes based on the project specific configuration.
  • Design of temporary portals supporting the suspended deck during construction.
  • Design of all column formwork arrangements including their reinforcement cage lifting and support during construction.
  • Design for the various pylon components including lifting, strengthening, transportation and temporary support.
  • Design for the access to the various levels of the pylon during construction.
  • Design of precast pile cap lifting and temporary supports on the piles.
  • Design of pile cap access platforms.
  • Design of boom pump and concrete pump line support frames, including variations to design at iterations in construction to ensure component reutilisation was maximised.
  • Design of pier diaphragm soffit formwork systems.
  • Design of various transportation and heavy lifting arrangements, including the head mast, formwork systems, and submodules.
  • Provision for immediate support throughout the construction phase of the project including 3D modelling and clash detection to ensure a smooth delivery.

We note that FSACE have completed a significant portion of the temporary works designs for this project.

Featured ProjectKingsford Smith Drive Upgrades

Type: TEMPORARY WORKS
Date: September 2016 to November 2020
Client: Lend Lease Engineering
Project: Kingsford Smith Drive Upgrades

View Project

The recent condition report completed by FSACE was excellent and we appreciate their prompt action on this project.  

Phil Bai, Director - ETEFAA