×

Melbourne Metro Tunnels and Stations

Featured Project: Melbourne Metro Tunnels and Stations

Type: Temporary Works
Date: January 2018 to Present
Client: Cross Yarra Partnership (D&C) Joint Venture
Project: Melbourne Metro Tunnels and Stations
Scope:

FSACE’s ongoing involvement on the Tunnels and Stations package for the Metro Tunnel Project in Melbourne has included a wide variety of tunnelling and associated infrastructure construction temporary works designs, including:

  • Retaining and hoarding structures;
  • Tramline support and tram shelter structures;
  • Access gangways, temporary driveways, vehicle barriers, ramps and stairs;
  • Service and personnel gantries including protection structures over, air scrubber enclosures;
  • Chemical bund slabs, vehicle service areas and davit arm structures;
  • Support structures for existing services during excavation, precast permanent formwork walls;
  • Tunnel boring machine (TBM) jacking arrangements, support systems and alignment frames and headwalls;
  • Penetration covers, hoist access platforms, monorails and service ladders and frames; and
  • Prefabricated reinforcement cages including arch reinforcement cage handling and installation structures.

Featured ProjectKingsford Smith Drive Upgrades

Type: TEMPORARY WORKS
Date: September 2016 to November 2020
Client: Lend Lease Engineering
Project: Kingsford Smith Drive Upgrades

View Project

The recent condition report completed by FSACE was excellent and we appreciate their prompt action on this project.  

Phil Bai, Director - ETEFAA